BRIDGE OVER THE LIM RIVER

print
email
Last update by 4 4
BRIDGE OVER THE LIM RIVER

Rudo, Bosna i Hercegovina.

Our company has started building a bridge on the river Lim, near the municipality of Rudo (Bosnia and Herzegovina), downstream from the future hydroelectric power plant "Mrsovo", and the total length of the bridge is 72 meters.

The bridge is made in three sections, and is designed as a composite structure with two coastal abutments and the two central pillars that are based on piles. It will have a traffic lane with a width of 4.5 meters and a pedestrian footpath.

The hydro power plant "Mrsovo" will have an installed capacity of 37.3 megawatts; the barrier dam will be 20 meters high and the reservoir will be 9.5 kilometers long and will run to the bridge in Rudo.

 

 

 

It has been read 12002 times